Load In And Load Out Planner

Coordinate supplier and crew movements through venue loading points with an editable Movement Schedule and Loading Points plan. A printable desk sheet supports on-the-day logistics control. This resource focuses on arrivals, departures and loading access; it is not the master lifecycle timeline or the production schedule that sequences technical and show activities, and it does not override venue traffic or access rules.

Browse event planning resources

Format
PDF · XLSX
Difficulty
Intermediate
Time
30 min
Stage
Plan → Build
Audience
Event organisers and Venue managers

What this resource helps you do

  • Capture the essential load in and load out planner inputs in one place
  • Hand off a consistent template across event planning owners
  • Reduce last-minute gaps before the plan milestone
  • Reuse the structure for the next event planning cycle

When to use this resource

  • After supplier requirements and venue access rules are known
  • Before issuing arrival slots and loading instructions
  • At the logistics desk during build and strike

What is included

  • load-in-and-load-out-planner.xlsx
  • load-in-and-load-out-desk-sheet.pdf
  • PDF + XLSX download package
  • Instructions: Guidance for planning logistics movements.
  • Event Setup: Event and venue logistics context.
  • Movement Schedule: Timed load-in and load-out movements.
  • Loading Points: Loading location controls and reference information.

Information required before starting

  • Supplier or crew movement requirements
  • Venue loading points and access constraints
  • Approved arrival, departure and contact information

What you produce

  • Movement schedule
  • Loading-point control plan
  • Printable logistics desk sheet

Who this is for

This resource is designed for Event organisers and Venue managers who need a practical, reusable document for event planning.

  • operations manager

    Coordinates movement slots, loading points and venue liaison.

  • production manager

    Supplies technical delivery dependencies and crew access needs.

Event-type use cases

  • exhibition

    Sequences exhibitor and contractor movements through constrained loading areas.

  • festival

    Coordinates supplier arrivals and strike departures across site access points.

How to use this resource

  1. 1

    Confirm venue loading controls

    Record approved access points, operating windows and local constraints.

  2. 2

    Build the Movement Schedule

    Enter each expected movement with time, owner and relevant contact.

  3. 3

    Balance Loading Points

    Review overlapping movements and allocate suitable loading locations.

  4. 4

    Issue confirmed slots

    Communicate controlled arrival information to suppliers and crew.

  5. 5

    Operate the desk sheet

    Use the printable companion for reference and keep changes in the workbook.

Common mistakes to avoid

  • Treating load-in as the whole production schedule — Coordinate production activities separately and link only the relevant movement dependencies.
  • Issuing slots without venue confirmation — Validate access rules and loading capacity with the venue owner.

Download files

Unlock this resource above to download every included file. Companion files do not need a separate form.

Load-in and load-out movement planner — editable XLSX

Editable workbook with Movement Schedule and Loading Points sheets for coordinating supplier and crew access during build and strike.

When to choose it: Use as the maintained logistics movement plan shared with venue and delivery leads.

XLSX · 9 KBLocked

Load-in and load-out logistics desk sheet — printable PDF

Printable desk-sheet companion for quick reference to confirmed movements and loading-point controls during build or strike.

When to choose it: Use at the loading desk after the editable schedule has been agreed.

PDF · 4 KB · CompanionLocked

Frequently asked questions

Frequently Asked Questions

How is this different from a production schedule?+

It controls physical arrivals, departures and loading locations; production scheduling sequences work and show activities.

Can the PDF be edited?+

Update the XLSX and use the PDF as a printable logistics reference.

Does it replace a venue traffic plan?+

No. Follow venue and site traffic controls and incorporate only approved instructions.

When should movement slots be confirmed?+

Confirm slots after access rules, loading points and supplier requirements are known. Reissue affected times when delays, vehicles or site restrictions change flow.

Tell me more